What should we do when public lighting regulation requires battery autonomy that standard products do not provide?

Written for: Public infrastructure engineer / municipality

Engineering answer

Do not ignore the requirement and do not force a non-compliant product. Treat the regulation as a design input and redesign the system around it. In Colombia, the RETILAP 36-hour autonomy requirement led Energy Division to co-engineer a compliant all-in-one lamp with 38 hours of autonomy.